nd.gov - The Official Portal for North Dakota State Government
North Dakota: Legendary. Follow the trail of legends

Top Navigation - Left

Multi-trip Permit

A multi-trip permit for nondivisible loads may be issued for specific routes identified in the permit application. The fee for this permit is the single trip permit fee multiplied by the number of days the permit is valid. This does not apply to special mobile equipment or loads over one hundred fifty thousand pounds.

 

  • Permit is valid for a maximum of 15’6” width, 14’6” height, 120’ length, and 150,000 pounds.
  • Permit can only be obtained through NDHP E-Permits or the Permits Section.
  • Permit cost is $20 per day with a minimum of 3 consequtive days and a maximum of 120 days.
  • Unused days are non-refundable.
  • Permit is not valid outside of specified routes.
  • No validation numbers will be issued for this permit to change routes, dimensions or weights, truck information, etc.

 

Return to E-Permits